Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project
Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project
Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project
Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum
Hainan Xinyi Re-production Project's first-line melting furnace arch was successfully closed.
At 9:59 a.m. on October 20, 2021, the first-line melting furnace arch of the Hainan Xinyi Re-production Project was successfully closed.
2021
11-03
The second-line cold repair project of Chongqing Wansheng successfully ignited.
At 11 a.m. on September 25, 2021, the Chongqing Wansheng second-line cold repair project was successfully ignited.
10-29
Kaisheng Junheng Pharmaceutical Glass No. 3 Furnace Project was successfully ignited.
At 9:58 on September 26, 2021, Kaisheng Junheng Pharmaceutical Glass No. 3 Furnace in Wei County, Handan was successfully ignited.
Everbright Suqian Project Boiler Hydraulic Pressure Test Was Successful.
The Everbright Suqian Project is a supporting power generation and heating project that burns 300,000 tons of industrial solid waste (excluding hazardous waste) per year, which was undertaken by Henan Installation's Electrical Engineering Department. On September 17th, the boiler hydraulic pressure test of this project was successful in one time.
10-19
Xinxiang Xinlianxin Project Ammonia Synthesis Tower Was Hoisted Successfully.
At 8:11 am on September 17, 2021, at the ammonia synthesis construction site of Xinxiang Xinlianxin Project, the ammonia synthesis section, with the hoisting of 800T crawler crane machines, the internals of the synthesis tower were slowly hoisted and the hoisting was completed smoothly in the end.
Jiangsu Changhai 100,000-ton tank kiln wire drawing project was successfully ignited.
At 8:18 a.m. on September 14, 2021, the installation project of the wire drawing production line of Jiangsu Changhai New Materials Co., Ltd. with an annual output of 100,000 tons was successfully ignited.
10-13