Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project
Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project
Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project
Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum
The company issued the "Construction Project Seal Management Measures"
Recently,inordertostandardizethesealmanagementofthecompany'sconstructionprojectdepartmentandstrengthentheriskcontroloftheprojectdepartment'sseal,thegroupcompanyissuedthe"CorporateProjectSealManagement
2019
07-30
Notice of Henan Provincial Department of Housing and Urban-Rural Development on Printing and Distributing the Implementation Rules for the Safety Inspection of the Project Quality and Safety Manual (Trial)
YuJianjian[2019]No.41 HousingandUrban-RuralDevelopmentBureau(committee)ofprovincialcitiesandthecouties(cities)underdirectprovincialgovernance,thePlanning,MunicipalConstructionandEnvironmentalProtecti
Improve the accountability mechanism and enhance management execution ability
The Group's "Interim Provisions on the Implementation of the Management of Accountability Education for Leading Cadres" was discussed and approved by the company's team on July 28th.
2018
12-26
Internal control and external guidance - for labor management we should attack with double fists
As a general problem in the current construction and installation industry, labor management is plaguing the development of enterprises. The marketization trend of labor service teams, the difficulty of personnel management, the low level of techniques, the poor professionalism, the lack of hard-working teams at critical moments, especially the shortage of labor service personnel, these problems have become a bottleneck restricting enterprise development.
The group company issued the "Outline of the Three-year Development Plan for Industrialization"
In order to fully implement the spirit of the company's "2017 General Manager Work Report", creating products and services with the lowest price, best quality and best service, and promoting the informatization, standardization, refinement and industrialization of the Group, giving full play to the advantage of deepened and optimized design and BIM technology, and achieving the goal of “building a comprehensive, diversified and internationalized modern enterprise group” as soon as possible, recently, the group company issued the “Outline of Three-Year Development Plan for Industrialization ”.