Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project
Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project
Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project
Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum
Jiangxi Lizhong high-boron glass first-line project successfully ignited.
At 13:18 on September 12, 2021, the first-line project of Jiangxi Lizhong high boron glass was successfully ignited.
2021
10-08
The methanol synthesis tower of Henan Junhua Project was successfully hoisted.
At 14:00 on September 9, 2021, Henan Junhua Project undertaken by the First Engineering Company of Henan Installation successfully completed the methanol synthesis tower hoisting work, which marked the successful completion of the key nodes of this project.
Jiangsu Changhai 100,000-ton tank kiln wire drawing project was successfully ignited
At 8:18 a.m. on September 14, 2021, the installation project of the wire drawing production line of Jiangsu Changhai New Materials Co., Ltd. with an annual output of 100,000 tons was successfully ignited.
09-29
The Beihai Municipal Solid Waste Incineration Power Generation Project started smoothly.
At 9:28 am on September 6, 2021, amidst the roar of the salute, the first hoisting of the boiler for the Beihai Municipal Solid Waste Incineration Power Generation Project undertaken by the Group's Power Engineering Division was successfully completed.
09-17
The batching silo of Taishan Fiberglass Zoucheng Project Department was successfully hoisted
At 20:10 pm on September 4, 2021, the Taishan Fiberglass Zoucheng Project Department successfully completed the lifting of 13 batch silos.
The Republic of Congo Red Star Glass Project successfully ignited.
The Republic of Congo at 8:08 am on September 1, 2021 local time, the Republic of Congo Red Star Glass One Kiln Two-line Flat-Draw Glass Production Line Installation Project undertaken by Henan Installation was successfully ignited.
09-09