Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
The main plant of the Longyuan Paper Thermal Power Project celebrated its topping-out
The large crown of the Algeria SOLARIS 600T/D ultra-clear rolled glass production line project was successfully closed.
The large crown of the tank furnace for Phase I of the Dongfang Hope Fengbo project was successfully closed.
The Lincang waste-to-energy project in Yunnan was successfully connected to the grid on its first attempt
Henan Province Installation Group won the honorary title of "2021 Luoyang City Integrity Private Enterprise"
Henan Province Installation Group won the honorary title of "2021 Luoyang City Integrity Private Enterprise" .
2021
12-08
Hu Chenghai, secretary-general of Henan Construction Industry Association, and his party visited Henan Installation for inspection and exchange.
On the morning of November 23, Hu Chenghai, secretary-general of Henan Construction Industry Association, and his group of 5 people visited the group company for research and exchange.
12-02
Luoyang Yu'an Metal Structure Co., Ltd. passed the certification of "National High-tech Enterprise"
Luoyang Yu'an Metal Structure Co., Ltd. was on the list and was recognized as a national high-tech enterprise.
The hydraulic test of the second phase expansion project of South Taihu was successful at one time.
The hydraulic test of the second phase expansion project of South Taihu passed the inspection with high quality.
11-22
Hainan Xinyi 600t/d cold repair line A successfully ignited.
At 10:59 on November 10, 2021, Hainan Xinyi's 600t/d cold repair line A was successfully ignited.
Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.
At 14:00 on November 5, 2021, Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.