Centralized procurement platform       Information management system      Online message

简体中文      ENGLISH           Email:476542052@qq.com

  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

NEWS

Group News

Industry news

Announcement

  • Home page
The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

The arch of the Saudi Gadian float cold repair project was successfully closed

The arch of the Saudi Gadian float cold repair project was successfully closed

2023

05-30

The main structure of the spinning workshop project of the Xinxiang Chemical Fiber Annual Production 20000 tons of Biomass Cellulose Project (Phase II) was successfully capped

The main structure of the spinning workshop project of the Xinxiang Chemical Fiber Annual Production 20000 tons of Biomass Cellulose Project (Phase II) was successfully capped

2023

05-30

Rainbow Hefei Photovoltaic Phase I Kiln Cold Repair Project Successfully Ignited

Rainbow Hefei Photovoltaic Phase I Kiln Cold Repair Project Successfully Ignited.

2023

05-23

The first lifting of the steel structure of China National Building Materials (Luoyang) New Energy Project was successful

The first lifting of the steel structure of China National Building Materials (Luoyang) New Energy Project was successful.

2023

05-23

The main structure of the 2 # training building of Henan Vocational and Technical College of Industry has passed the acceptance inspection smoothly

The main structure of the 2 # training building of Henan Vocational and Technical College of Industry has passed the acceptance inspection smoothly.

2023

05-23

Unity of mind from top to bottom, achieving fruitful results in a hundred days of hard work

The Hundred Day Campaign has entered the sprint stage.

2023

05-23

< 1...333435...68 >
  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

Headquarters Address: No. 25 Fengye Road, Yibin District, Luoyang City, Henan Province

Email: 476542052@qq.com

Henan Province Installation Group Co., Ltd.      Powered by  www.300.cn     SEO    This website supports ipv6

Business License