Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt
The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.
The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed
Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited
Wangcheng Avenue Expressway was fully completed on November 29
On November 29th, the Wangchaoling Interchange to Lianhuo Expressway section of Wangcheng Avenue Expressway, which was constructed by Municipal Engineering Department of Henan Province Installation Gr
2020
12-01
Working Record of Ulanqab Domestic Waste Power Generation Project
On November 21, the protection of the induced draft fan of the 10kV #2 boiler of the Ulanqab domestic waste incineration power generation project tripped, and our commissioning personnel worked hard to solve the problem in time.
Henan Province Installation Group and Xi'an Jiaotong University signed the "Framework Agreement for Jointly Building a Postdoctoral Innovation Base"
11-24
Chairman Huang Kezheng, along with his delegation visited Yu’an Metal Structure Co., Ltd. for research and guidance
On the afternoon of November 16, Huang Kezheng, Chairman of Henan Province Installation Group, Yu Jianqun, Vice President of the Group Company, along with their delegation visited Yu'an Metal Structur
11-19
The first hoisting of steel box girder of H ramp on Luoyang Torch Avenue was successfully completed
On the morning of November 9, the first span steel box girder of the H ramp of the fourth section of the Torch Avenue in Luoyang was successfully hoisted, marking that the H ramp part of the interchan
On the morning of November 9, the first span steel box girder of the H ramp of the fourth section of the Torch Avenue was successfully hoisted。