Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt
The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.
The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed
Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited
The bottom plate pouring of the impregnating agent workshop in Inner Mongolia Haotian Fiberglass Project has been completed
2023
12-18
The Shaoxing Qibin project float line and electronic line were successfully ignited
The first lifting of boiler 1 # in Henan Huatian Thermal Power Project was successfully completed
11-20
The main body of the comprehensive building of the new hospital area construction project of Yichuan County Traditional Chinese Medicine Hospital was successfully topped off
Xinxiang Chemical Fiber New Area 1×360t/h boiler and 2×B25MW cogeneration project successfully passed the acceptance of the main structure
Successful grid connection of No.1 gas turbine in the 1500MW gas combined cycle independent power plant project on the Syr River in Uzbekistan