Centralized procurement platform       Information management system      Online message

简体中文      ENGLISH           Email:476542052@qq.com

  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

NEWS

Group News

Industry news

Announcement

  • Home page
The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

The steel truss of the 114 belt gallery of Chongqing Fengni Aggregate Project has been successfully hoisted

2025

01-17

The upper structure of the limestone powder silo at the Guoxin Jingjiang project has been topped out

2025

01-17

SuXin Power (Shuyang) Thermal Power Co., Ltd.'s cogeneration expansion project - boiler steel frame first lift successfully completed

2025

01-07

The boiler of Yunnan Yuanyang project has successfully undergone a 100 day water pressure test on the first try

2024

12-24

Guangyuan Tongwei project 1 # steam turbine cover successfully completed

2024

12-24

The large arch of Indonesia Xinyi Float Glass Phase I installation project has been successfully closed

2024

12-16

< 1...141516...69 >
  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

Headquarters Address: No. 25 Fengye Road, Yibin District, Luoyang City, Henan Province

Email: 476542052@qq.com

Henan Province Installation Group Co., Ltd.      Powered by  www.300.cn     SEO    This website supports ipv6

Business License

豫ICP备19004065号-1