Centralized procurement platform       Information management system      Online message

简体中文      ENGLISH           Email:476542052@qq.com

  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

NEWS

Group News

Industry news

Announcement

  • Home page
Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project

Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project

Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project

Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project

Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project

Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project

Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum

Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum

Luoyang Yu'an Metal Structure Co., Ltd. passed the certification of "National High-tech Enterprise"

Luoyang Yu'an Metal Structure Co., Ltd. was on the list and was recognized as a national high-tech enterprise.

2021

12-02

The hydraulic test of the second phase expansion project of South Taihu was successful at one time.

The hydraulic test of the second phase expansion project of South Taihu passed the inspection with high quality.

2021

11-22

Hainan Xinyi 600t/d cold repair line A successfully ignited.

At 10:59 on November 10, 2021, Hainan Xinyi's 600t/d cold repair line A was successfully ignited.

2021

11-22

Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.

At 14:00 on November 5, 2021, Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.

2021

11-22

The first main structure of the second phase of the Silu Yucheng construction project officially capped.

On the morning of November 2, the No. 12 building of the main body of the Silu Yucheng Phase II project, which was undertaken by the Construction Engineering Department of Henan Installation, was officially capped, and the capping celebration ceremony was held at the construction site of the project.

2021

11-16

The second line of Zhongshan Yufeng Glass Cold Repair Project was successfully ignited.

At 9:48 am on October 24, the second-line cold repair project of Zhongshan Yufeng Glass was successfully ignited.

2021

11-12

< 1...454647...71 >
  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

Headquarters Address: No. 25 Fengye Road, Yibin District, Luoyang City, Henan Province

Email: 476542052@qq.com

Henan Province Installation Group Co., Ltd.      Powered by  www.300.cn     SEO    This website supports ipv6

Business License