Centralized procurement platform Information management system Online message
简体中文 ENGLISH Email:476542052@qq.com
ABOUT US
Company Profile
Leader's Speech
Honor
WORKS CATEGORY
Architectural
Metallurgical
Municipal
Electrical Power
Building Materials
Petrochemical
International
TECHNOLOGY
Construction Method
Patent
Informatization
Industrialization
GROUP INDUSTRY
Industry Scope
Industrial Network
CUSTOMERS
NEWS
Group News
Industry news
Announcement
CONTACT
Contact Us
Message
Safe and Successful Topping-Out of the Chimney Shaft at the Shanxi Zhongsheng Project
Successful Hoisting of Boiler No. 2 Water Wall at Shaowu Tianhao Jintang Industrial Park Heat Source Construction Project
Successful Single-Attempt Grid Connection for Yunnan Dongsheng Paper Phase IV Mechanical Installation Project
Xinjiang Haoyuan Boiler Installation Project: Successful Single-Lift Installation of No. 2 Boiler Steam Drum
Luoyang Yu'an Metal Structure Co., Ltd. passed the certification of "National High-tech Enterprise"
Luoyang Yu'an Metal Structure Co., Ltd. was on the list and was recognized as a national high-tech enterprise.
2021
12-02
The hydraulic test of the second phase expansion project of South Taihu was successful at one time.
The hydraulic test of the second phase expansion project of South Taihu passed the inspection with high quality.
11-22
Hainan Xinyi 600t/d cold repair line A successfully ignited.
At 10:59 on November 10, 2021, Hainan Xinyi's 600t/d cold repair line A was successfully ignited.
Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.
At 14:00 on November 5, 2021, Duchang Shouchuang waste-to-energy steam turbine runs successfully at one time.
The first main structure of the second phase of the Silu Yucheng construction project officially capped.
On the morning of November 2, the No. 12 building of the main body of the Silu Yucheng Phase II project, which was undertaken by the Construction Engineering Department of Henan Installation, was officially capped, and the capping celebration ceremony was held at the construction site of the project.
11-16
The second line of Zhongshan Yufeng Glass Cold Repair Project was successfully ignited.
At 9:48 am on October 24, the second-line cold repair project of Zhongshan Yufeng Glass was successfully ignited.
11-12