Centralized procurement platform       Information management system      Online message

简体中文      ENGLISH           Email:476542052@qq.com

  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

NEWS

Group News

Industry news

Announcement

  • Home page
The main plant of the Longyuan Paper Thermal Power Project celebrated its topping-out

The main plant of the Longyuan Paper Thermal Power Project celebrated its topping-out

The large crown of the Algeria SOLARIS 600T/D ultra-clear rolled glass production line project was successfully closed.

The large crown of the Algeria SOLARIS 600T/D ultra-clear rolled glass production line project was successfully closed.

The large crown of the tank furnace for Phase I of the Dongfang Hope Fengbo project was successfully closed.

The large crown of the tank furnace for Phase I of the Dongfang Hope Fengbo project was successfully closed.

The Lincang waste-to-energy project in Yunnan was successfully connected to the grid on its first attempt

The Lincang waste-to-energy project in Yunnan was successfully connected to the grid on its first attempt

The main structure of the Kindergarten at Luoyang Normal University successfully passed the acceptance inspection.

2025

08-22

The foundation trench inspection for Plot 2 of the Phase I Resettlement Block in the Luoyang New Energy Industrial Park Urban Village Redevelopment EPC Project has been successfully passed.

2025

08-22

The hydrostatic test for Boiler No. 1 at the Gongyi Eco-Industrial Park Waste-to-Energy Project was successfully completed

2025

08-22

The furnace crown of the third glass production line at the Kibing Glass Malaysia Sabah facility was successfully closed

2025

08-22

Battling the Gobi Heatwave: Henan Installation Efficiently Advances the Xinjiang Huineng Project

2025

08-22

The first phase of the Shangshui Yu'anfu project has passed the final completion acceptance inspection

2025

06-30

< 1...91011...73 >
  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

Headquarters Address: No. 25 Fengye Road, Yibin District, Luoyang City, Henan Province

Email: 476542052@qq.com

Henan Province Installation Group Co., Ltd.      Powered by  www.300.cn     SEO    This website supports ipv6

Business License