Centralized procurement platform       Information management system      Online message

简体中文      ENGLISH           Email:476542052@qq.com

  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

NEWS

Group News

Industry news

Announcement

  • Home page
The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The unit of the Shougang Jingtang new 120MW high-efficiency gas power generation project was successfully connected to the grid on the first attempt

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The main structure of Plant 3 for machining of the induction heat treatment complete equipment project has been successfully topped out.

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

The first column hoisting of the melting and casting workshop project of the 150,000 t/a zinc-based materials green intelligent manufacturing project has been completed

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

Changxing Kibing Glass Line 4 Cold Repair Project Successfully Ignited

The main structure of the main plant of the pilot research and development project for regenerated cellulose fiber (Shousai fiber) using ionic liquid method with an annual output of 10 million tons has been successfully capped

2024

10-22

Ruyang Dukang Distillery Project successfully passed the intermediate node acceptance

2024

10-22

The boiler water pressure test of Guangda Rizhao project was successfully completed once

2024

10-22

The second-line melting furnace of the Malaysian Xinyi Phase 5 photovoltaic installation project has been successfully ignited

2024

10-22

Jiangsu Changhai 150000t fiberglass tank kiln project successfully ignited

2024

10-22

Tanzania project successfully ignited

2024

10-22

< 1...171819...68 >
  • ABOUT US

    • Company Profile

    • Leader's Speech

    • Honor

  • WORKS CATEGORY

    • Architectural

    • Metallurgical

    • Municipal

    • Electrical Power

    • Building Materials

    • Petrochemical

    • International

  • TECHNOLOGY

    • Construction Method

    • Patent

    • Informatization

    • Industrialization

  • GROUP INDUSTRY

    • Industry Scope

    • Industrial Network

  • CUSTOMERS

  • NEWS

    • Group News

    • Industry news

    • Announcement

  • CONTACT

    • Contact Us

    • Message

Headquarters Address: No. 25 Fengye Road, Yibin District, Luoyang City, Henan Province

Email: 476542052@qq.com

Henan Province Installation Group Co., Ltd.      Powered by  www.300.cn     SEO    This website supports ipv6

Business License

豫ICP备19004065号-1